• Home
  • About Railway Cables European Signalling System for Rail Industry | Electrification System for Rail Industry | Basic Design for Railway Cables | Application
  • Products
  • Applications Industry | Reference List
  • Technical Information Material Properties | Standards | Customized Products | Product Certificates | Cable Glossary | FAQ
  • News & Exhibitions
  • Download
  • Link Testing Authorities | Testing Equipment Manufacturers | Magazines | Organizations | Caledonian Corporater Website
  • Sitemap
  • Contact
  • 中文

Product List

 

Traction Cables

 

Signalling & Control Cables

 

Telecom Cables

 

Power & Control Cables

 

Databus Cables

 

High Temperature Cable

 

Coaxial Cable

 

Send an enquiry to us

 

News | Exhibitions

Ultracapacitor energy storage offers metro operators 20% savings

 

 

SOUTH KOREA: Metro operators in Seoul, Daejon and Incheon have achieved power savings of more than 20% using ultracapacitor braking energy recuperation technology, according to ultracapacitor manufacturer Maxwell Technologies.

 

Up to 200 Maxwell Technologies 48 V multi-cell ultracapacitor modules are installed in 750 V and 1·5 kV energy recuperation systems which Woojin Industrial Systems has supplied for seven metro stations, as well as the Korea Train eXpress depot in Seoul. These follow an initial demonstrator installed in Seoul in 2009 under a contract awarded by Korean Railroad Research Institute. Additional installations are planned for 2014-15.

 

The ultracapacitors have been found to operate reliably in temperatures from -40°C to 65°C, and through more than 1 million charge/discharge cycles. 'Ultracapacitors' rapid charge and discharge capabilities make them the most efficient option for energy storage and power delivery in braking energy recuperation systems,' according to Dr Eun K Lee, Vice-President at Woojin Industrial Systems. 'In addition to being highly efficient in recycling energy that otherwise would be wasted, Maxwell's ultracapacitors operate reliably in low and high temperature environments and have met our expectations for long operational lifetime.

CALEDONIAN

Marchants Industrial Centre, Mill Lane Laughton, 
Lewes, East Sussex, BN8 6AJ, UK

Tel: 44-207-4195087

Fax: 44-207-8319489

Email: enquiry@railway-cables.com